Rate Analysis of Excavation in Earthwork

•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.

Excavation calculator: cost and volume | JustCalc.com

X — Width of the pit; B — Depth of the pit; Y — Length of the pit. These parameters are to be entered in meters. Beside that, you are requested to specify: Price per 1 m³ of digging; Price per 1m³ of the soil removal. At the preparation stage, the most important is to …

A CONSTRUCTION MANUAL

cubic meters in a 1.5 X 3.4 meters deep cylinder. A gas cap to cover the tank should be 1.4 meters in diametr X 1.5 meters tall. COST ESTIMATE. $145-800 (U.S., 1979) includes materials and labor. *Cost estimates serve only as a guide and will vary from country to country.

How to Calculate Quantities of Cement, Sand and Aggregate ...

Step-1: Calculate Volume of Materials required. Density of Cement = 1440 kg/cum (Approx) Volume of 1 Kg of Cement = 1/1440 = 0.000694 cum. Volume of 01 bag (50 kg) of cement = 50 X 0.000694 = 0.035 cubic meter (cum) Since we know the ratio of cement to sand (1:2) and cement to aggregate (1:4)

BrickWork Calculation & Calculator | Quantity of Sand ...

Apr 20, 2018· BrickWork Calculation & best automatic calculator to find quantity of bricks with or without mortar and you can also add thickness of RCC bed if required in calculation. Types of Bricks, How to calculate the no. of bricks required for 1 cubic meter, No. of bricks required in a wall.

Cost to Excavate Land - 2021 Cost Calculator (Customizable)

For a basic project in zip code 47474 with 10 cubic yards, the cost to Excavate Land starts at $78.92 - $190 per cubic yard. Actual costs will depend on job size, conditions, and options. To estimate costs for your project: 1. Set Project Zip Code Enter the Zip Code for the location where labor is hired and materials purchased. 2.

Construction Board: Rate Analysis of PCC : (Plain Cement ...

Aug 01, 2019· PCC only Labour: Rs.400/Cum. 100 to 150mm thick PCC only Labour: Rs.6.00/Sqft. Plum Concrete Only Labour: Rs.8.50-9.00/Cuft That is 300/Cum. Cement Bag: Rs.50- 60/Bag. Shuttering With Material: Rs.450-550/ Sqm. All above Rates is current market rate and analysis are considered as per Mix design report.

PLASTERING, PAINTING AND POLISHING

6 mm thick (1%3) single coat 0-081 per square metre 6 mm thick (1%4) single coat 0-055 per square metre 20 mm thick (1%4) double coat 0-19 per square metre (15 mm $ 5 mm) Table 13.2: Required amount of material for plaster of each per 100 sq meter Mix 1%2 Mix 1%3 Mix 1%4 Mix 1%5 Mix 1%6 Thickn ess (mm) Sack of cement (Number) Sand (cubic

RCC cost per cubic feet/ cubic meter/ sq ft - Civil Sir

Volume of rcc concrete slab= 1000 sq ft × 5/12 ft= 416.6 cft, 1 cubic meter = 35.32 cft, then Volume of rcc slab = 416.6/35.32 = 11.8 cubic meter. 1) Steel required for 1000 square feet rcc slab:- Thumb rule for Steel required for RCC slab is 80 kgs/m3, then quantity of steel required for 1000 sq ft ( 11.8 m3) rcc slab is equal to = 80 × 1.18 ...

Costs of a Biogas Plant - energypedia

The cost per cubic meter of digester volume decreases as volume rises. Therefore, the appropriate size of the biogas plant should be estimated. For simple, unheated plants in tropical countries, the digester size is roughly: 12 to 20-fold the quantity of substrate put in daily at average expected digester temperatures over 25°C and

ANALYSIS OF RATES

1.44Gm/1.52Gm/1.65Gm per cubic centimeter in road embankments respectively upto 3m/more than 3m high and top 0.5m below sub-grade level within 50m initial lead and 1.5m initial lift from approved borrow pits away from the toe of the final section of the road embankment bottom of the pit not being cut by an

CHAPTER 4 - EXCAVATION AND EARTHWORK

Trial pits shall be dug in the area where excavation is required to be done. The steady water level in the trial pits which is left undisturbed for 48 hours before the pumping operations are started, shall be considered as sub-soil water level in the area. 7. Rates for items 401 to 409 include 50-m. free lead and 1.5 m. free lift. 8.

How many hours does it take to manually excavate 1 cubic ...

Answer (1 of 4): Excavating a cubic meter of dirt for a footing by hand is a serious job. For ordinary soil, that is, soil that isn't packed hard or full of roots, rocks, or other debris, the 3 to 4 thousand pounds of soil can be removed by a single worker in a few hours. There isn't an exact way...

CRANES BUCKETS: CLAM, DRAG, GRAPPLE, HYDRAULIC

cubic yards to cubic meters: 1 cy = 0.7646 cm; 1 cm = 1.308 cy; COMPLETE DETAILS ARE REQUIRED FOR PARTS SEARCH AND THE REASONS ARE: 1 WE NEED THE TYPE OF MACHINE, BRAND NAME, MODEL NUMBER, SERIES NUMBERS, SPEC NUMBERS (ALSO KNOWN AS PRODUCTION NUMBER IN SOME BRANDS), SERIAL NUMBERS AND DESCRIPTION TO GET …

askEngineerOsaz': Current Construction Workers' Labour ...

Pls I need the cost per cubic meter of floor area for storey building and bungalow for year 2016,2017,20018,2019,2020 and 2021. Pls treat as URGENT. Reply Delete

Biogas Plant at Best Price in India

Organic Waste Biogas Plant. ₹ 36,028 / Cubic Meter. S P ECO Fuel Enterprises. Modular Bio CNG Plant, For Industrial, Plant Size: 10 Mt To 100mt. ₹ 4.50 Crore / Unit. Dream Techno Machineries & Equipments Private Limited. Prefabricated Industrial Biogas Plant, Plant Size: 25 Cubic Meter…

Vermicomposting 1. Introduction

are the items required to be considered while setting up a unit for production of vermi-compost. 3. About the worms 3.1 Of about 350 species of earth worms in India with various food and burrowing habits Eisenia fetida, Eudrilus eugeniae and Perionyx excavatus are some of the species that are reared to convert organic wastes into manure.

RCC Calculator | Estimate Cement, Sand, RCC Online Calculator

Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree.com, you can also …

How much labour and mason are required for 10 Cu.M. …

Answer (1 of 3): Depends on a lot of factors Length of the construction Time allotted for it Type of construction Distance between mixing place and pouring place Whether hand placed or machine pumped.. etc However generally for ordinary construction around 20 labour-days will be required fo...

TECHNICAL CALCULATION AND ESTIMATOR'S MAN-HOUR …

1. COMPLETE MANUAL (239 pages) US$ 600 US$ 1000 2. EACH CHAPTER IPIPING ABOVE GROUND - 36 pages + 20* US$ 180 US$ 300 ... complete and not detailed enough, and the time required for a good technical calculation is getting every day shorter. It is not easy to present exact technical figures and quantities for the equipment or operations not fully

MINISTRY OF LABOUR AND EMPLOYMENT NOTIFICATION …

Gazette of India, Extraordinary, Part II, section 3, sub-section (i), vide number G.S.R. 773 (E), dated the 20 th October, 2011, as required by sub-section (1) of section 59 of the said Act, inviting objections and suggestions from all persons likely to be affected thereby on or before the expiry of a period of three

4. ESTIMATING ROAD CONSTRUCTION UNIT COSTS

1 truck × 3 loads/hr × 20 tons/ld × m 3 /2.6 ton = 23 m 3 /hr. If 4 trucks are used: Cost per cubic meter solid rock = $4.03. The total unit cost of per cubic meter of rock spread on the road is.

Excavation Cost Calculator | Estimate Excavation Cost

Excavation Cost Definition. Use our excavation cost calculator to instantly calculator how much an excavation job will cost. Enter the length, width, and depth of the area that needs to be excavated and the cost per yard and our calculator will return the total cost of excavation.

How to calculate the Labor, equipment, shuttering & rebar ...

Aug 31, 2016· 1- material. 2- labour charge. material means :1- concrete price and that depend of wat element u want to cast it sub or super struc. and is it required green concrete or SRC or OPC approxmately it will be around AEd255 if its green concrete. oAed 215 if it SRC for mix 400 kg grade 40 n. also pump charge will be assume 50/m3

Minimum water quantity needed for domestic uses

There is at least 1 water point per 250 people. Table 2. Water collection standards Two vessels 10-20L for collecting water plus one 20L vessel for water storage, (narrow necks and covers) per 5 person . Table 1. Some standard water requirements Standard: All …

Technical Brief No 2 - International Labour Organization

determine the required labour force and the duration of the project. Choosing the correct work norm is the most critical part of this process. As a very simple example, one kilometre of drainage ditch to be excavated for a pipeline could be considered as only one activity, i.e. excavation. If …

How to Estimate the Cost of a Temporary Site Dewatering …

Jun 15, 2012· Section 4 - Overview of Labor, Material, Equipment, and Indirect Costs Labor is included in a temporary wellpoint dewatering estimate to install, operate, maintain, and remove the dewatering system. The calculation of labor costs will take into account the company's labor rates, the makeup of the labor crew, and labor productivity rates.

How much labour is required for concrete placement …

Answer (1 of 4): There's no out of the book formulas to calculate this one. The minimum number of labours required would be at the least. These number are mostly apt for large slabs where there are multiple pours and shall not be necessary for small slabs. With the following or even lesser labour...

Water-Sump/Tank Calculator IS 3370-1

Where, m 3 (Cubic meter) and ft 3 (Cubic feet) is a total volume and Lt (liter) is a total volume in liter.; Length, breadth, and depth in meter/cm and total volume in Lt (liter). Note: 1 m 3 = 35.3147 ft 3

Estimates of Electricity Requirements for the Recovery of ...

Estimated electricity requirements for cement production .....29 Table 10. Estimated electricity requirements for the production of chromite ore products (lump, chip, and fines of chemical, metallurgical, and foundry grade chromite) from underground room and pillar